|
|
Evergreen Cemetery Greeley, CO
An irrigation system master plan and construction document package
were developed for the 128-acre site. The design adheres to Colorado
Springs Utilities requirements for non-potable water.
Aqua Engineering, Inc.’s design work includes connecting into the
City of Colorado Springs Utility Department’s existing effluent
distribution mainline, and isolating blocks for winterization and
maintenance purposes. The project includes over 3000 sprinklers, 200
remote control valves, 9 controllers, and a computer operated irrigation
control system.
|
|
|
 |
|